Ritz Carlton - Naples, FL
- New outdoor walk-in freezer.
- Design-Build project involved civil engineering with stamped drawings, concrete pad with bollards, full electric and refrigeration, reinforced door, and hurricane proof construction rated to withstand 140 mph winds.
- We’ll help you design and implement the best possible solution – all from one source!