Pittsburgh Hospital

  • Problem: The client had approximately 40 carts that were being washed by hand, consuming far too many employee hours and producing substandard results.
  • Solution: This cart washer was engineered to handle three carts at a time, and can be set for a 2, 3 or 5 minute cycle. It was designed as a pass-through so the soiled carts would be naturally separated from the clean ones.
  • Result: A dramatic improvement in the cleanliness and sanitation of the carts, slashed labor costs and better employee morale.